Specifications | 40′ |
---|---|
Main Beams | Designed with Camber – built in Spencer facility |
Web | 1/4″ high grade 100,000 yield steel |
Flange | 3/8″ x 5″ high grade 100,000 yield steel |
Cross Members | 4″ x 3.2# 80,000 yield Jr. I-beam on 16″ centers |
Side Rails | 6″ x 8.2# structural C channel |
Brake Size | 16.5″ x 7″ |
Upper Deck Length | 11′ |
Lower Deck Ride Height | 40-3/4″ |
Transition Drop from Upper to Lower Deck | 19.5″ |
Overall Width | 102″ |
Specifications | 45′ |
---|---|
Main Beams | Designed with Camber – built in Spencer facility |
Web | 1/4″ high grade 100,000 yield steel |
Flange | 3/8″ x 5″ high grade 100,000 yield steel |
Cross Members | 4″ x 3.2# 80,000 yield Jr. I-beam on 16″ centers |
Side Rails | 6″ x 8.2# structural C channel |
Brake Size | 16.5″ x 7″ |
Upper Deck Length | 11′ |
Lower Deck Ride Height | 40-3/4″ |
Transition Drop from Upper to Lower Deck | 19.5″ |
Overall Width | 102″ |
Specifications | 48′ |
---|---|
Main Beams | Designed with Camber – built in Spencer facility |
Web | 1/4″ high grade 100,000 yield steel |
Flange | 3/8″ x 5″ high grade 100,000 yield steel |
Cross Members | 4″ x 3.2# 80,000 yield Jr. I-beam on 16″ centers |
Side Rails | 6″ x 8.2# structural C channel |
Brake Size | 16.5″ x 7″ |
Upper Deck Length | 11′ |
Lower Deck Ride Height | 40-3/4″ |
Transition Drop from Upper to Lower Deck | 19.5″ |
Overall Width | 102″ |
Specifications | 53′ |
---|---|
Main Beams | Designed with Camber – built in Spencer facility |
Web | 1/4″ high grade 100,000 yield steel |
Flange | 3/8″ x 5″ high grade 100,000 yield steel |
Cross Members | 4″ x 3.2# 80,000 yield Jr. I-beam on 16″ centers |
Side Rails | 6″ x 8.2# structural C channel |
Brake Size | 16.5″ x 7″ |
Upper Deck Length | 11′ |
Lower Deck Ride Height | 40-3/4″ |
Transition Drop from Upper to Lower Deck | 19.5″ |
Overall Width | 102″ |