Price
| Specifications | 48′ |
|---|---|
| Main Beams | Designed with Camber – built in Spencer facility |
| Web | 1/4″ high grade 100,000 yield steel |
| Flange | 3/8″ x 5″ high grade 100,000 yield steel |
| Cross Members | 4″ x 3.2# 80,000 yield Jr. I-beam on 16″ centers |
| Side Rails | 6″ x 8.2# structural C channel |
| Brake Size | 16.5″ x 7″ |
| Upper Deck Length | 11′ |
| Lower Deck Ride Height | 40-3/4″ |
| Transition Drop from Upper to Lower Deck | 19.5″ |
| Overall Width | 102″ |
| Specifications | 53′ |
|---|---|
| Main Beams | Designed with Camber – built in Spencer facility |
| Web | 1/4″ high grade 100,000 yield steel |
| Flange | 3/8″ x 5″ high grade 100,000 yield steel |
| Cross Members | 4″ x 3.2# 80,000 yield Jr. I-beam on 16″ centers |
| Side Rails | 6″ x 8.2# structural C channel |
| Brake Size | 16.5″ x 7″ |
| Upper Deck Length | 11′ |
| Lower Deck Ride Height | 40-3/4″ |
| Transition Drop from Upper to Lower Deck | 19.5″ |
| Overall Width | 102″ |